BMC Netreo Deployment Service
33 CREDITS
What you get:
BMC will perform the following:
- Conduct workshop to explore Netreo's capabilities and ensure readiness for a smooth deployment.
- Perform configuration assistance for all Service Engines* , modules and features.
- Conduct project management, project planning, and milestone tracking.
- Configure integrated authentication with Active Directory or SAML 2.0
- If not applicable, configure up to five local users.
- Configure a one-way event integration with an ITSM application incident module (e.g., BMC Helix ITSM).
- Configure up to five Event Management rules.
- Define and deploy up to ten auto configuration rules.
- Perform device addition(s) by:
- Importing, subnet scanning, virtualization synchronization, wireless access points through API integrations (Cisco and Aruba), VeloCloud Edge device additions through API VeloCloud controller, and Cloud object additions through API integration with cloud platform(s) (Azure and AWS).
- Configure up to ten monitoring templates.
- Type, sub-type, category, sites, standard KPIs (CPU, Memory, Disk, Interface Bandwidth, Interface errors, Host state, Interface state, other services available depending on vendor of managed device)
- Additional configuration to include:
- 1 API Integration, Virtualization, 5 WebART and 1 EmailART, Netflow.
- Syslog, SNMP Trapping with up to 5 logging rules.
- 1 Maintenance windows, 2 Custom dashboards, 2 Custom & advanced reporting.
- 5 Custom pollers/device types
- Configure groupings:
- Categories, sites, actions (Active response, webhooks), Strategic Groupings (Functional Groupings, Business Workflows.
- Up to 100 groupings collectively.
- Prepare Readiness Assessment Document
- Prepare Construction Document
- Prepare Test Plan
- Perform knowledge transfer/walkthrough session (up to two hours) as per Customer environment.
- Session recording will be shared.
Customer will be responsible for:
- Validation of Readiness Assessment Document
- Providing requirements on event management use cases
- Provide required access and privileges for event integrations
- Provide required access and privileges to Incident ticketing system for incident creation
- Conducting functional testing
BMC will provide this service with one of the approaches below:
Delivery Options | Success Credits Required |
---|---|
Country-Specific Staffing*
|
33
|
Deliverables: Using BMC’s standard methodology and templates, the following Deliverables are in scope for this project and will be delivered:
- Readiness Assessment Document
- Construction Document
- Test Plan
Completion Criteria: BMC will have completed the Service when the in-scope Service have been completed and the Deliverables have been reviewed in accordance with the Terms of Use and delivered to the customer Project Manager. From delivery start date, the service must be consumed and completed within 30 days. Consultant days must be booked in no less than 8-hour increments/full days.
Pre-requisites:
- License to an ITSM application (ex: BMC helix ITSM, ServiceNow, etc...)
Additional information:
- Estimated Duration: 5-6 weeks
- In-scope Product: BMC Netreo
- Service Type: Deployment
- Availability: Active
- Success Service Code:
- NETR_DEPL_001_ONSHORE
- Date Last Updated: 06/24/2024